HPC Syslog

HPC Syslog

Log over changes and events on UiB's HPC systems

Menu

Skip to content
  • Home
  • About
  • RSS
HPC Syslog

Shutdown of hexagon due to a short cooling stop

lsz075 • March 3, 2008
We will need to shut down hexagon due to a short cooling stop to fix a minor water-leakage in the new cooling system.

The downtime is scheduled for Tuesday March 4th from 0800 to 0900.

Update: The machine was down from 08:15 to 09:15.
Posted in Downtime, Scheduled maintenance on March 3, 2008 by lsz075.

About lsz075

IT-avdelingen

View all posts by lsz075 →

Post navigation

« Power shutdown of fimm Thursday the 28th Quad-core upgrade of hexagon »

Categories

  • AIX
  • Configuration changes
  • CPU Quota
  • cyclone
  • Downtime
  • Education
  • Filesystem
  • Hardware
  • Installation
  • Linux
  • Queue
  • Scheduled maintenance
  • Software
  • Uncategorized
  • Upgrade

Archives

Follow @UiB_VD
Register Log in
Powered by WordPress