HPC Syslog

HPC Syslog

Log over changes and events on UiB's HPC systems

Menu

Skip to content
  • Home
  • About
  • RSS
HPC Syslog

Hexagon: scheduled maintenance, Dec 19th

lsz075 • December 14, 2011
We will have a scheduled maintenance for hexagon on Monday, December 19th. Approximate time slot is from 10:00 to 14:00

We need to replace 2 PDUs in failed cabinets and some CPUs, memory.
Update: 14:50 Machine is back available.
Posted in Scheduled maintenance on December 14, 2011 by lsz075.

About lsz075

IT-avdelingen

View all posts by lsz075 →

Post navigation

« Hexagon: thunderstorm power failure Fimm: maui down »

Categories

  • AIX
  • Configuration changes
  • CPU Quota
  • cyclone
  • Downtime
  • Education
  • Filesystem
  • Hardware
  • Installation
  • Linux
  • Queue
  • Scheduled maintenance
  • Software
  • Uncategorized
  • Upgrade

Archives

Follow @UiB_VD
Register Log in
Powered by WordPress