HPC Syslog

HPC Syslog

Log over changes and events on UiB's HPC systems

Menu

Skip to content
  • Home
  • About
  • RSS
HPC Syslog

Hexagon reboot after power blink

Alexander Oltu • December 8, 2017
After a series of power blinks, Hexagon high performance network, as well as some nodes are in inconsistent state. We have to restart whole machine.
Posted in Downtime on December 8, 2017 by Alexander Oltu.

Post navigation

« Hexagon is up after reconfiguration Hexagon scheduled maintenance on January 3rd »

Categories

  • AIX
  • Configuration changes
  • CPU Quota
  • cyclone
  • Downtime
  • Education
  • Filesystem
  • Hardware
  • Installation
  • Linux
  • Queue
  • Scheduled maintenance
  • Software
  • Uncategorized
  • Upgrade

Archives

Follow @UiB_VD
Register Log in
Powered by WordPress