There is a planned maintenance on the electric power line in the server room for the 25th of September. Therefore Hexagon, related file systems and storage enclosures has to be taken offline.
The maintenance is scheduled to start at 20:00. According to plan, Hexagon should be back by the end of the day.
Running jobs will be stopped. All scheduled jobs in the queue will be started automatically when the system is operational again.
Update 20.09.2017: Please note the time change. The maintenance window has been moved from Saturday, 23rd of September to Monday, 25th of September 20:00.
Update 26.09.2017: UPS maintenance is over yesterday night, and we have a problem to take hexagon online due to some filesystem storage issues. We are working on it and we apologize for inconveniences.
Update 26.09.2017: Hexagon is up and available again since 09:08 AM.
Update 14:00_26.09.2017: Hexagon work file system crashed unexpectedly, we are working on it. sorry for inconveniences.
Update 14:40_26.09.2017 Hexagon has to be taken down due to hardware issues related to work filesystem. We try to resolve problems as soon as possible.
Update 16:40_26.09.2017 Hexagon is back online again. problem with work filesystem is resolved.